Primary Electrical Improvements
About this Project
The Step 4 project provides the addition of new 12kV Substations and completes the installation of a 12kV out power system loop including the addition of supervisory control and data acquisition (SCADA) system controls. The scope of work includes: Installing 12kV switchgear at University Substation; Constructing a new 12 kV South Substation on the outer campus utility loop; Installing a new 12kV feeder from University Substation to South Substation; Providing a new 12 kV feeder and duct bank system between South Substation and East Substation; Replacing East Substation and Central Plant CP1 and CP2 switchgear protective devices; Replacing cogeneration MV-01 switchgear relay protective devices; Providing an entirely new 12kV SCADA system; Installation of SCADA system hardware, programming and communications at each substation; Interconnecting substation SCADA systems with redundant communication systems; Replacing existing Rule 21 protection system relays and PLC interface.

Status
Projected Completion:
February 2018
Project Phase:
Completed
Last Updated:
03/30/2022
Project Details
| Project Manager: | Jeet Singhal |
| Design & Construction Team | |
|---|---|
| Gen. Contractor: | Helix Electric |
| Architect: | Mithun |
| Struct. Eng.: | DCI Engineers |
| Civil Eng.: | KHR Associates |
| Mech./Plumbing Eng.: | Hartford Engineering |
| Electrical Eng.: | Michael Wall Engineering |
| Landscape Architect: | Mithun |
| Sub-Contractors | |
|---|---|
| Electrical: | Helix Electric |
| Waterproofing: | Angelus Waterproofing |
| Steel Fabrication: | Advanced Welding |
| Masonry: | Masonry Concepts |
| Earthwork: | HMS |